Project Description
For this project, we totally gutted the kitchen. We reconfigured the kitchen, added better lighting, tiled the floor, installed custom cabinetry and under cabinet lighting, and tiled the backsplash.
The bathroom was gutted as well. We removed the old window and install glass block. We built a bench and inset shelves in the shower. We also installed pocket doors to free up bathroom.
The Challenges
The biggest challenge was the time table. We did this job while the family was on vacation, so some late hours were involved.